Don’t confuse turbulence with trend.

Boutique Modern Ltd.’s distress is a warning light about our system, not #MMC.

We have BOPAS for product/process assurance; what’s missing is pipeline assurance from Government: multi-year, volume-backed call-offs, continuity clauses (escrow, bonds, step-in), and MMC-savvy approvals that recognise repeatable systems.

Right now, the same MMC kit can be re-argued across multiple boroughs—duplicating drawings, RFIs and delay. This does not happen in the UK Ministry of Defence NHS Estates and Facilities Department for Education

Let’s fix it with mutual recognition, pattern-book consents, and a single MMC evidence pack aligned to Building Safety.

In November, BUILDOFFSITE × The Offsite Guide are convening 90-minute Downtime Workshops to convert pain points into a Downtime Sprint Framework—and test whether a shared-capacity model can smooth utilisation.

Join us and help turn policy intent into factory hours.

Book your place here

 

search the archive

Can't find what you are looking for on this page? Search the entire news archive here.